‘The Stratford Upon Avon & Midland Junction Railway’ (or S.M.J.) was a small independent railway company which ran a line across the empty, untouched centre of England. It visited the counties of Northamptonshire, Warwickshire, Oxfordshire and a little of Buckinghamshire, only existing as the SMJ from 1909 to 1923. In 1923 the S.M.J.became a minor arm of the London Midland and Scottish (L.M.S.), then in 1948 'British Railways' 

Gone but not forgotten: "the damsel is not dead, but sleepeth"


.

SMJ Forum

Blisworth - Towcester ETS working

Electric train staff equipment had been brought into use between Blisworth and Towcester by 9 August 1910 (date of SMJR minute 451 (TNA file RAIL 674/3)) and presumably the new signal box at Blisworth appeared at the same time. In that this was so…Continue

Started by Richard Maund on Saturday.

Blisworth 1920

SMJ board minute 1474 of 13 April 1921 (TNA file RAIL 674/4) approved that “the following expenditure be charged to Capital” for year 1920: “Blisworth: Signalling and alterations to Permanent Way, Improvements and additional signalling: £800”. In…Continue

Started by Richard Maund on Saturday.

Evesham Redditch & Stratford-upon-Avon Junction Railway 8 Replies

Did this railway (as opposed to the East & West Junction Railway) go into receivership - if so, when. And when did it come out of receivership?Continue

Started by Richard Maund. Last reply by Richard Maund Feb 11.

Bidford-on-Avon 5 Replies

Shall we bring this discussion under the proper heading!So far as the OS plan surveyed 1885, published 1886, is concerned: the OS liked - wherever they could  - to have text running parallel to the top and bottom borders. When they came to add the…Continue

Started by Richard Maund. Last reply by Richard Maund Feb 10.

SMJ photos

  • Add Photos
  • View All

Without wishing to start a debate on the pros and cons of HS2, it occurred to me that the proposed route must cross the SMJ somewhere. I looked at the map on the following link:

www.thehs2.com/phase1/maps/showmap.php?type=Google

and it appears that HS2 will cross the old SMJ routes in two places:

i) just to the west of Aston le Walls village on the section between Byfield and Fenny Compton and ii) about halfway between Helmdon and Cockley Brake Jcn.

I don’t know how much of the old trackbed and infrastructure is still visible in these locations but the construction of HS2 is likely to obliterate whatever is there. I have no idea when, or if, work will start but I thought that it might be a good idea if someone photographed these particular areas for posterity before they change. If I was closer I would do it myself but it’s a bit far from where I live in France!

Any thoughts?

John

Views: 672

Reply to This

Replies to This Discussion

Maybe a link to Helmdon station could be proposed. After all, the damsel only sleepeth!

The line of trees in the photo is the SMJ on a slight embankment, Running left from Helmdon to right at Cockley. The HS2 will slice right through it at right angles roughly inbetween the four tress in a square. I will get down there and take some more.

Thanks Les - lovely sylvan scene. It will be great if you can take more pictures of this quality.

If HS2 does go ahead, an awful lot of the beautiful heart of England, such as this, will be blighted. BR should have retained the Great Central trackbed and maintained the bridges etc so that it could now be used as a viable north-south route without having to spend mega-billions on HS2......

This is where the proposed HS2 route will cut the SMJR near Greatworth.

One of the previously considered alternative routes that was eventually rejected was to pass between Blakesley and Woodend crossing the SMJ roughly near the site of the Hall.

I thought that they were going to use a majority of the GCR trackbed? If not, they ought to, as the infrastructure such as cuttings, embankments, bridges ect is still all in place along the entire route between London and Leicester, seems logical anyway.

I don't think that logic plays much of a part in government thinking.......

Richard Woods said:

I thought that they were going to use a majority of the GCR trackbed? If not, they ought to, as the infrastructure such as cuttings, embankments, bridges ect is still all in place along the entire route between London and Leicester, seems logical anyway.